Does this chimney repair need a permit?

Send the failed inspection report

Which repairs usually need a permit

The city or county building department decides what needs a permit at a given address, so the answer for a Covina house can differ from one in Monrovia or an unincorporated pocket of the county. As a rule of thumb, work that changes the structure or the fuel tends to need one: rebuilding a chimney above the roofline, taking a chimney down, installing a gas insert or a new gas fireplace with a gas line, and some liner installations. Like-for-like repairs, such as a new cap, resealing flashing or patching a crown, often do not.

We check with the building department for your address before the job is scheduled, and the written quote says whether a permit is part of it. If one is needed, the permit fee and the city inspection are listed on the quote, not added later.

  • Rebuild above the roofline: usually a permit
  • Gas insert or gas line: usually a permit
  • Cap, flashing reseal, crown patch: often none
  • Liner: depends on the city and the appliance

How sign-off works

Where a permit is required, the city sends an inspector to look at the work at set points, and the permit is closed once the inspector signs off. For a home sale or a property file, that closed permit is the record that the repair was done to the standard the city enforces. We keep the permit number on the invoice and send the sign-off along with the after photos.

Where no permit is required, the record is our invoice with before and after photos of each item. For most failed Level 2 findings that is what a buyer, an agent or a manager asks for.

What failing a Level 2 usually means

A failed Level 2 is a list, not a verdict. The common items are a missing or rusted cap, flashing letting water in, a wide chimney with no cricket behind it, a cracked crown, cracked flue tile that calls for a liner, and a damper that will not seal. Each has a cause, and each has a fix. Some carry a published price on this page. The rest, crown, liner, damper, chase cover and flashing on its own, are quoted in writing after we have seen them, because the size of the job varies too much from one chimney to the next.

Wood-burning changes have one more layer in this part of the county. South Coast AQMD Rule 445 governs wood-burning devices in Los Angeles County, so an owner deciding between rebuilding a firebox for wood and switching to gas should ask about both on the same quote.

Repair first, rebuild only when it has to be

Most failed chimneys need repairs, not a new chimney. We quote the smallest fix that brings each item up to standard and stops the cause, and we show you the photo that justifies anything bigger. When a rebuild is the honest answer, for example a stack loose above the roofline after years of water and ground movement, the quote explains why a repair would not hold.

Prices for the usual fixes

Figures for the repairs that follow a pattern. The cap is quoted after we measure. Any permit fee is listed separately on the written quote.

Leak tracing and repair
$590 to $3,500
Roof cricket built behind the stack
$470 to $1,060
Cricket plus all-new step and counter flashing
$705 to $1,750
Sealed gas insert set into the old firebox
$2,950 to $5,900
Level 2 inspection to confirm the findings
$410
Stainless or copper cap fitted to the flue
Quoted after we measure

We put a written figure on crown, liner, damper, chase cover and stand-alone flashing work once we have seen it.

Permit and code questions

Who decides whether my repair needs a permit?

The building department for your address. We check with it before scheduling and note the answer on the written quote.

Does a new chimney cap need a permit?

Usually not, since it is a like-for-like part. We still confirm with the city when the cap is part of a larger permitted job.

Is a gas insert permitted work?

In most cities, yes, because it involves a gas line and venting. The permit and city inspection are listed on the quote when they apply.

What record do I get when no permit is needed?

An itemized invoice with before and after photos of every repair, which is what buyers, agents and managers usually ask for.

Can you fix everything on a failed Level 2 report?

We quote every item on it. Each line is priced on its own, so you can do all of them or decide which ones come first.

Do I need a new inspection after the repairs?

Where a permit is pulled, the city inspects. Where not, our after photos document the work, and a follow-up visit can be booked if a buyer or lender asks for one.